More progress. I’ve been being overloaded by work, and then we’ve been trying to figure out cabinets so we can order them in time.
Garage stairs
![]() |
From land |
Side entrance/wood shed
![]() |
From land |
Garage side entrance
![]() |
From land |
Central partition downstairs
![]() |
From land |
All roof sheathing on except the space for the ridge vent
![]() |
From land |
Windows arrived
![]() |
From land |
Half of bathroom and bedroom walls up
![]() |
From land |
More taping of roof done and trim added to bottom edges of roof
![]() |
From land |
Almost all the upstairs walls
![]() |
From land |
Foaming in all the cracks for an airtight house
![]() |
From land |
Downstairs bath and bedroom walls all framed
![]() |
From land |